Weldspec Projects
Non-Destructive Testing And Heat Treatment Services
Client: Total Energies
TOTAL/JOCAP Absheron EPS Project
Bos-Shelf, Baku Azerbaijan
2019-2023
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at Baku, Azerbaijan
Jacket, Topside, Offshore Hook Up and Installation
Client: Total Energies
TOTAL/URF Absheron EPS Project, Subsea & Marine Workscope
Bos-Shelf, Baku Azerbaijan
2019-2023
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at Baku, Azerbaijan
Client: BP Azerbaijan
BP ACE – PDQ Jacket Construction
Bos-Shelf, Baku Azerbaijan
2019-2023
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 153 metres, Weight – 16,200 Tonnes
Number of Well Slots: 48
Piles: Twelve 170M long X 2.4 diameter
Client: SOCAR (State Oil Company Azerbaijan Republic)
Socar Karabakh Jacket
Bos-Shelf, Baku Azerbaijan
2018-2022
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 175 metres, Weight – 14,500 Tonnes
Number of Well Slots: 48
Piles: Twelve 185M long X 2.4 diameter
Client: BP Azerbaijan
BP SDB – QU Jacket Construction
Bos-Shelf, Baku Azerbaijan
2014-2017
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 184 metres, Weight – 18,200 Tonnes
Number of Well Slots: 48
Piles: Twelve 195M long X 2.4 diameter
Client: BP Azerbaijan
BP SDB – PR Jacket Construction
Bos-Shelf, Baku Azerbaijan
2014-2017
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 108 metres, Weight – 13,014 Tonnes
Number of Well Slots: N/A
Piles: Twelve 120M long X 2.4 diameter
Client: BP Azerbaijan
BP WC – PDQ Jacket Construction
Bos-Shelf, Baku Azerbaijan
2010-2013
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 184 metres, Weight – 18,200 Tonnes
Number of Well Slots: 48
Piles: Twelve 195M long X 2.4 diameter
Client: BP Azerbaijan
BP DWG – PCWU Jacket Construction
Bos-Shelf, Baku Azerbaijan
2005-2007
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 190 metres, Weight – 15,413 Tonnes
Number of Well Slots: N/A
Piles: Twelve 200M long X 2.4 diameter
Client: BP Azerbaijan
BP DWG – DUQ Jacket Construction
Bos-Shelf, Baku Azerbaijan
2005-2007
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 191 metres, Weight – 15,823 Tonnes
Number of Well Slots: 48
Piles: Twelve 200M long X 2.4 diameter
Client: BP Azerbaijan
BP EA – PDQ Jacket Construction
Bos-Shelf, Baku Azerbaijan
2003-2005
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 167 metres, Weight – 16,670 Tonnes
Number of Well Slots: 48
Piles: Twelve 180M long X 2.4 diameter
Client: BP Azerbaijan
BP WA – PDQ Jacket Construction
Bos-Shelf, Baku Azerbaijan
2003-2005
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 145 metres, Weight – 13,973 Tonnes
Number of Well Slots: 48
Piles: Twelve 160M long X 2.4 diameter
Client: BP Azerbaijan
BP CA – CWP Jacket Construction
Bos-Shelf, Baku Azerbaijan
2003-2005
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 145 metres, Weight – 13,973 Tonnes
Number of Well Slots: N/A
Piles: Twelve 140M long X 2.4 diameter
Client: BP Azerbaijan
BP CA – PDQ Jacket Construction
Bos-Shelf, Baku Azerbaijan
2002-2004
Engaged as the Incumbent N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services
Jacket: Eight leg, Jacket Height – 143 metres, Weight – 13,730 Tonnes
Number of Well Slots: 48
Piles: Twelve 140M long X 2.4 diameter
Client: ESSO
Esso Balder
Inchgreen Scotland
1997-1998
Engaged as the N.D.T. Contractors providing Ultrasonic, Eddy Current, Radiography and M.P.I. Services at Inchgreen, Scotland
Floating Production Storage and Offloading Vessel
Complete Overhaul of all Structural and Piping components
Client: Conoco UK Ltd
Total North Topside Alwyn
U.I.E. Clydebank
1997-1998
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services.
Client: Turkish Petroleum / Mumentum Engineering
Kuzey Marmara Project
Istanbul, Turkey
1996-1997
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at Istanbul, Turkey. Total Construction Tonnage: 450 Tonnes
• Jacket: 15M
• Deck: 11M X 10M
• Piles: 1.2M
ADDITONAL COMMENTS:
The above project was the first offshore gas installation to be carried out in turkey, it included jacket and deck construction, piling, shore pipeline and commissioning.
The location for the installation was approximately 2KM offshore Silivri in the sea of Marmara. Onshore construction of deck and jacket was successfully completed in Tulza shipyard 5KM south of Istanbul.
First gas expected late September 1997.
Client: Texaco North Sea Uk Company
Texaco Captain Project
U.I.E. Clydebank
1994-1996
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E. Clydebank, Scotland. Total Construction Tonnage: 15000 Tonnes
• Topsides (7000 Tonne) 67M LONG X 40M WIDE X 48M FROM CELLAR DECK TO TOP OF CRANE ‘A’ FRAME.
• Jacket (5000 Tonne) FOUR LEGGED BASE 34M X 34M X 127M HIGH
• PILES (2800 TONNE) EIGHT 96” DIAMETER
• DRILLING AND DOCKING TEMPLATES (200 TONNE)
Client: Total Oil Marine PLC
Total Dunbar Project
U.I.E. Clydebank
1992-1994
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E. Clydebank, Scotland. Total Construction Tonnage: 9000 Tonnes
TOPSIDES: 75M X 36M X 24M
Client: BP Exploration
BP Hyde Topside & Jackets
U.I.E. Clydebank
1992-1993
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E. Clydebank, Scotland. Total Construction Tonnage: 2400 Tonnes.
• Jacket: 25M X 22M X 52M
• Deck: 21M X 30M X 18M
• Piles 1372 Diameter
Client: Amoco (Uk) Exploration Company
Amoco Lomond Project
U.I.E. Clydebank
1991-1992
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E. Clydebank, Scotland. Total Construction Tonnage: 10,100 Tonnes
• Deck: 21M X 30M X 18M 9750 Tonnes
• FLARE BOOM: 80M LONG 350 Tonnes
Client: Ranger Oil UK Limited
Ranger Anglia Project
U.I.E. Clydebank
1990-1991
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E. Clydebank, Scotland. Total Construction Tonnage: 1970 Tonnes
• Jacket: 25M X 25M X 40M (Tripod) 500 Tonnes
• Deck: 22M X 23M X 18M 750 Tonnes
• Piles: 102M Long X 1.5M O.D. 720 Tonnes
Client: BP/Britoil
B.P. Amethyst Project Phase 1 + 2
U.I.E. Clydebank
1988-1990
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services during the construction of 2 Off Jackets, Topsides & Piles Total 10,600 Tonnes at U.I.E. Clydebank, Scotland.
(Phase I)
• Jacket: 25mx22mx52m High (1,047T)
• Jacket: 25mx21mx46m High (957T)
• Integrated Deck: 20mx30mx18m (1,029T)
• Integrated Deck: 20mx30mx18m (1,044T)
• Piles 1.372m Diameter (1,862T)
(Phase II)
• Jacket: 24mx21mx46m High (1,195T)
• Jacket: 24mx21mx46m High (960T)
• Integrated Deck: 22mx36mx18m (760T)
• Integrated Deck: 22mx35mx18m (805T)
• Piles 1.372m Diameter (1,001T)
Client: Conoco (UK) Ltd
Southern Basin Gas Development
U.I.E. Clydebank
1986-1987
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E Clydebank, Scotland. Total Construction Tonnage: 3431 Tonnes
• Integrated Deck (Vanguard) 23.75 X 22.5 X 16 X 817 Tonnes
• Integrated Deck (Vulcan 1) 23.75 X 22.5 X 16 X 910 Tonnes
• Integrated Deck (South Valiant) 23.75 X 22.5 X 16 X 831 Tonnes
• Integrated Deck (Vulcan 2) 23.75 X 22.5 X 16 X 873tonnes
All decks were constructed under cover in our fabrication halls to a high degree of completion before movement to the outside pad erection areas where they were each encased in plettac covers for final completion activities.
Client: Transworld Mr Mac
Mr Mac Project (Gorilla Type Jack Up Rig)
U.I.E. Clydebank
1984-1988
Engaged as the N.D.T. Contractors providing Ultrasonic, Radiography and M.P.I. Services at U.I.E Clydebank, Scotland. Total Construction Tonnage: 17,000Tonnes. Gorilla Type Jack Up Rig.






